archive-lv.com


Web directory, archive
Search archive-lv.com:


Find domain in archive system:
archive-lv.com » LV » B » BUVMEISTARS.LV

Total: 655

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • A S SIGULDAS BŪVMEISTARS
    63ps EUR 6 55 0 63 EUR 6 55 5 40 EUR 6 55 20 40 EUR 6 55 40 70 EUR 6 55 0 32p Не сертифицирован EUR 7 25 LA 0 32 EUR 6 35 0 45 EUR 6 35 0 56 EUR 6 35 0 63 EUR 6 35 0 63ps EUR 6 35 LA 3 10 EUR 9 05 5 20 EUR 8 65 доломитовые высевки

    Original URL path: http://www.buvmeistars.lv/rus/razosana_28_print.htm (2016-02-17)
    Open archived version from archive


  • A S   S I G U L D A S   B Ū V M E I S T A R S
    ieguvuši sudraba kategorijas novērtējumu AS Siguldas Būvmeistars savu darbību ir sertificējis atbilstoši starptautiski zināmiem standartiem ISO 9001 2009 Kvalitātes vadības sistēma OHSAS 18001 2007 Arodveselības un darba drošuma pārvaldības sistēma un ISO 14001 2005 Vides pārvaldības sistēma Finished objects Finished objects LAT RUS ENG Home Current Events Finished objects News Finished objects Leisure Time JSC Siguldas Būvmeistars Newspaper We support back There are no correspondent data in data base Inserted

    Original URL path: http://www.buvmeistars.lv/eng/aktualitates_5.php?id=68&lpp=0 (2016-02-17)
    Open archived version from archive

  • A S   S I G U L D A S   B Ū V M E I S T A R S
    of Elementary Boarding School of Tilža back With a solemn event on 16 04 2015 was completed the object Elementary Boarding School of Tilža renovation project in framework of project Complex solutions for reducing greenhouse gas emissions in Elementary Boarding School of Tilža Work was carried out from October 2014 to April 2015 Overall we have completed the following works 1 Plinth insulation 192m2 2 Facade renovation 1940m2 3 Basement

    Original URL path: http://www.buvmeistars.lv/eng/aktualitates_5.php?id=62&lpp=0 (2016-02-17)
    Open archived version from archive


  • A S   S I G U L D A S   B Ū V M E I S T A R S
    the art kitchen equipment and the possibility of controlling the heating of your flat Every flat has a spacious storage space in the basement and a marked place at the parking lot There were some innovations developed in this project too Thicker window and balcony door frames with a higher coefficient of sound and heat insulation in order to improve sound insulation the partition walls between the flats were built of reinforced concrete and lightweight concrete only there were heating and water meters with the possibility of taking readings remotely a modern ventilation system installed along with some other improvements Despite the unfavourable weather conditions at the end of the summer we have managed to build a multi dwelling unit from foundation to finish within 8 months At the same time we have been building two twin houses in Bruklenu Street where the finishing work is in progress at the moment The volume of finished work this year is indicative of professionalism of our team We should also recognise the selfless work of our supervising engineer Martins Locmelis the unity of the team of Pavels Vaisla the high quality of our finishing work specialists under the management of our company

    Original URL path: http://www.buvmeistars.lv/eng/aktualitates_5.php?id=61&lpp=0 (2016-02-17)
    Open archived version from archive

  • A S   S I G U L D A S   B Ū V M E I S T A R S
    works at Sigulda Sports School are finished back In the beginning of September the renovated gymnasium of Sigulda Sports School was opened ceremonially in the presence of the management of the Sigulda County Council representatives of Siguldas Buvmeistars JSC young sportsmen and their parents The repair works completed by the builders of Siguldas Buvmeistars JSC included the dismantling of floors constructing of the new floor constructive layers and coverings replacing

    Original URL path: http://www.buvmeistars.lv/eng/aktualitates_5.php?id=60&lpp=0 (2016-02-17)
    Open archived version from archive

  • A S   S I G U L D A S   B Ū V M E I S T A R S
    in the Siguldas hospital of Riga region During the project there were performed the construction works in 8 wards of the surgery and therapy section as well as carried out the reconstruction of connected engineering network and the section toilet facilities The works were performed by our specialists and supervision was organized by Aleksandrs Bezruks Inserted 09 07 2007 see pictures Finished the construction works of Inčukalna underground gas reservoir compressor station No1 We have finished the construction works of Inčukalna underground gas reservoir compressor station No 1 During the project we performed engineering communication base building works gas refinement assembly base construction road and field construction in the entire space 5300sm water pipe and sewerage construction pump station construction rain water sewerage cabel sewerage system in the length 28 km On the construction object worked our best specialists The construction works were supervised by Rolands Gaspažiņš Inserted 19 03 2007 see pictures Trade Centre Alhaus in Tukums In November of year 2006 JSC Siguldas Būvmeistars finished the largest object of the year 2006 trade centre Alhaus in Tukums Zemites street 2a The contracting authority of the trade centre is D V Ltd The overall space of the trade centre is more than 6200 m2 where 1300m2 are forced for outdoor shed of the construction materials Inside the centre there are areas with stockrooms for construction materials and furniture and also a cafe with auxiliary rooms on the ground floor The overall trade centre inside space on the ground floor is 4705 m2 overall space of the first floor is 191 7 m2 The project has been very successful in general In the beginning the area was unarranged and inexpressive but now its infrastructure and environment are both well arranged The trade centre is nicely illuminated has a wide parking

    Original URL path: http://www.buvmeistars.lv/eng/aktualitates_5.php?lpp=5 (2016-02-17)
    Open archived version from archive

  • A S   S I G U L D A S   B Ū V M E I S T A R S
    Sigulda housing development On 11 December following a formal opening we put the new apartment house in operation in the housing development in Sigulda There are a total number of 12 three room flats in the house The construction operations on the house took place between March and December this year At present all flats are let out Thank you very much to the work supervisor Ivo Rohtls and Martins Locmelis Pavels Vaisla and all other our employees and subcontractors for the work well done and successful cooperation Inserted 13 12 2013 see pictures We put into operation the newly built boat centre Marina Malina in Markalnes Street Riga On 15 November all those involved in the construction process gathered during a festive event in the newly built Marina Malina for a ribbon cutting ceremony and putting the new marine in operation The administrative building of the boat service the dock building with a maintenance area and the marina were built within the framework of the agreement The construction operations of the external networks were completed There was a water and sewage museum developed at the same time including the restoration of the museum exhibits The improvement works of the territory were conducted We worked in the unit from spring 2012 to autumn 2013 Our gratitude extends to the customer Aqua Brambis LLC and its Chairman of the Board Aivars Brambis for successful cooperation Thank you very much to the construction supervisor Sandris Paplavskis a representative of the field supervision Guntars Malina and the designer Alksnis LLC Our gratitude also extends to our builders Ivo Rohtla and Martins Locmelis who worked in the unit and managed construction operations Thank you very much to all workers and subcontractors Armoteks LLC Vikom LLC Totas LLC Kvinta LLC Siltumsuknu centrs LLC Stalli LLC and Wi Fi LLC Inserted 19 11 2013 see pictures JSC Siguldas Būvmeistars has finished the construction operations on the water supply and sewerage networks in Sigulda We have finished the construction operations on the water supply and sewerage networks within the framework of the agreement Construction of water supply and sewerage networks in Sigulda The procurement 1st Part Within the scope of the concluded agreement the construction of the infrastructure networks of the water handling facilities took place mainly in Rozu Varpas J Ozola Akaciju Pulkveza Brieza Kr Valdemara Sveices Kaijas Blaumana and Judazu Streets As a result of the implemented project after the construction of 3610m of sewerage networks including their leads to the property borders the number of households with the possibilities of connecting them to the centralized sewerage system has increased Thus the accessibility to the centralized sewerage services will decrease the pollution of household waste water drained from the accumulation reservoirs to the environment Within the framework of the agreement there is also one sewerage pumping station built and another sewerage pumping station renovated Within the scope of the present agreement the water supply system was extended constructing the water supply network of 7196 m

    Original URL path: http://www.buvmeistars.lv/eng/aktualitates_5.php?lpp=1 (2016-02-17)
    Open archived version from archive

  • A S   S I G U L D A S   B Ū V M E I S T A R S
    networks 2 stage of procurement Id nr SA 2011 04 Nr 25 This year on 21st November before the due date we successfully commissioned the building site Construction of Sigulda Water supply and Sewerage networks 2 stage of procurement Id nr SA 2011 04 Nr 25 In terms of the Sigulda project there were laid gravity sewers in streets Chiatura Saules Berzu Satiksmes Talavas Lapu un Purva Completed works Gravity household sewerage 1600 m long sewer Planting 2320 м2 Renovation of asphalt 335 m2 Renovation of gravel covering roads 1163 m2 We are thanking our project manager Martinsh Posheika and other our employees for successful work during the project implementation I would like to express our special gratitude to our client Saltavots Ltd for successful cooperation and assistance in implementation of complicated solutions Inserted 22 11 2012 see pictures We have completed renovation works of the Sports School of Sigulda s facade We have completed renovation operations of the Sports School of Sigulda s facade During renovation the building was insulated with stone wool paying special attention to the details and connections using the profiled and even steel sheets of the same color in the facade We have also maintained the combined visual appearance of the building block s facade The concrete border along the perimeter of the building was restored there was also the rainwater collection system put in order the surrounding territory where the repairs took place was landscaped It is planned that insulation of the facade will improve the interior climate in the interior of the school as well as reduce the central heating payments Inserted 20 11 2012 see pictures We completed works at the site New wastewater treatment plant design and construction works in village Ritausma of parish Islice On 16th November with red band cutting there was put into operation Islice wastewater treatment plant in village Ritausma During the project implementation there was the old chlorine chamber demolished and new wastewater treatment plant built with capacity 772m3 day consisting of pre treatment station aeration tanks and outlet facilities The plant is fully automated There were also the office building of 64m2 the roofed sludge deposit site of 240m2 roads and squares stone block paving of 1270m2 and outdoor networks sewerage 220m long water supply 100m long built The period of works completion was 18 months We are thanking the client Īslīces Ūdens Ltd and our subcontractors Vesta ABM Ltd in civil construction works and LaKalme Ltd in design works equipment supply and installation and SCADA setup We are thanking our project manager Janis Keiselis and other employees for their input into successful project implementation Inserted 16 11 2012 see pictures We have completed and put into operation water management object in Baltinava In total there have been 6 km of water supply and sewage networks built on this site As well as there have been constructed water iron removal station with capacity of 15m3 h and sewage treatment station with a capacity of 8m3

    Original URL path: http://www.buvmeistars.lv/eng/aktualitates_5.php?lpp=2 (2016-02-17)
    Open archived version from archive



  •  


archive-lv.com, 2017-10-22